Single Publication
Could not determine your location.
Happy Fire Update November 8, 2024 11-08-2024
Happy
Publication Type: News - 11/08/2024 - 17:26
Acreage Targeted:150
Acreage Completed:150
Elevation: 4700
Location: NPS Housing Lane/Death Valley Drive Firing West to Hotel Creek
Firing start Time:1000
Firing Completed:1500 (No control Issues)
Plan for Saturday 11/9: 150 Acres From Hotel Creek headed West to 180 and tie into Lewis Crk
Smoke Report: Smoke rise 2000ft AGL with light transport winds to the East
Fire Behavior: Low intensity south aspect on 20% slope, minimal torching, 3-5 ft scorch height, with surface flame lengths Averaging 2ft and heavy dead and down consisted of 7ft avg flame lengths. Rate of spread in needle cast was approximately 1 chain per hour at head and backing at .20 chains per hour.
Consumption: 60-70% consumption on 1000 hr fuels, with a clean finished understory burn throughout
Primary Carrier: Long Needle, Oak Litter, Grass, Heavy dead and down
WX: Favorable SW 3-6 majority of day w/ Gusts to 7, with a low RH of 22 @1200, RHs started pull up at about 1400 and fuels were still actively receptive and consuming well.
Personnel on Scene
2 – FS Type 3 Engines SQF E347-SQF E-323
1 – SEKI E-42 Type 6
1 – SMOD (Arrowhead, C91, 552) Firing and Holding
1 – Scorpions 1 2IA hand crew Patrol and Holding
1 – UAS Module. PSD and IR
1-NPS Fire EFX Mod of 3