Incident Media Photographs
Could not determine your location.
Photographs Gallery

A Redmond IHC sawyer lines up his face cut to fall a hazard tree within the Beech Creek Fire.

Morning operational briefing at the Incident Command Post.

Redmond IHC preparing for their shift on the Beech Creek Fire.

Crews set up folding tanks in order to utilize a hose lay along the fire's edge.

Redmond IHC constructing direct handline on the Beech Creek Fire.

A hose lay constructed along contingency dozer line.

A sawyer bucks a downed snag to allow crews to extinguish flames with water.

Redmond IHC briefing before the start of their shift.

Fire crews constructing a hose lay along Division A on the Beech Creek Fire.

Firefighters packing hose along the line to construct a hose lay.

View of the fire from a nearby ridgeline.

Redmond IHC preparing for their shift on the Beech Creek Fire.